October
11, 2001 The old redwood tanks are now
disconnected and
waiting for removal.
The new treatment plant will
be built on the location where
they now stand.
|
 |
The first redwood tank
is being pulled down
with a back hoe.
|
|
Now the second tank is down.
|
 |
Pipes being laid out and
the foundation being dug. |
 |
Forms and re-bar. |

|
The slab being finished. |

|
The new treatment plant
building is up. |
 |
The Ozone and the
polymer contact tanks
are in place. |
|
 |
The filters are in place. |

|
Chlorine Analyzer and
two power supplies for
the turbid meters inside
the east room. |

|
The plumbing manifold for
the filters in the
west room. |
 |
The main control panel
in the west room. |
| |
More photos soon. |